Tell us about your next project

Enquiry

Tel: (029) 2036 0434

Menu

Services Employed

  • Electrical
  • Mechanical

After nearly 2 years, work is now drawing to a close on the first phase of the New Bay Campus constructed for Swansea University on reclaimed industrial land at Swansea Bay.

Overview

The campus has a mixture of accommodation and academic buildings and it is these academic buildings that CMB West have been involved in the construction of 5 of the 7 facilities constructed. The buildings range from a state of the art library facility and data storage centre, teaching and engineering facilities to a large assembly / function hall.

Each building has had different challenges and a range of individual services to suit their varied use. Manufacturing Building was primarily used as a teaching and administration facility for their Engineering faculty.

The Great Hall was built in a classical style to provide the campus with a central focus and large hall for graduation ceremonies and concerts. Learning Resource Centre is a state of the art library with automatic book and document recovery systems and storage for other data resources.

The SMaRT Building was designed specifically for the University’s partner companies for research staff to explore new ways of treating and investigation of properties of metals used in high speed turbines for aircraft and power generation.

CMB West also worked closely with the Principal Contractor VINCI Construction UK to provide a safe workplace for all site personnel and regularly topped various tables collated by VINCI for Safety with several members of the CMB Team winning individual awards.

Gallery

Client Testimonial

Whilst like all large design and construction projects there have been challenging periods and tasks, I would like to personally thank each and every member of the CMB Team for their hard work and effort in ensuring the successful completion of the project which we hope everyone involved found interesting and a project to be proud of.

Peter Davies

Project Information

Location:
Swansea
Services:
M & E
Client:
Swansea University
Duration:
2 Years

Location

Helping our clients to succeed

At CMB Engineering, we can offer and perform many excellent services to suit each clients needs.

Our Services