top of page

Therapia Lane Depot Now Complete

  • Writer: CMB Engineering
    CMB Engineering
  • Jun 17
  • 1 min read

CMB Engineering’s latest project handover is Therapia Lane Depot – the redesign and full refurbishment of an underutilised vehicle maintenance site, transforming it into a state-of-the-art operational base for Sutton’s waste and street cleaning fleet.

 

CMB were awarded the Mechanical contract for this project by Principal Contractor, Willmott Dixon, and commenced works on site back in June 2024, handing the project over only 10 months later.

You can read the full project handover case study and see our gallery images by clicking here.



CMB COLOUR.png
bottom of page
Consent Preferences