KLA

DJI_0621.JPG
KLA

CMB are proud to announce the successful completion and handover of the specialist fit-out and MEP works for KLA’s new UK R&D and Manufacturing Centre in Newport.

 

This landmark project combined advanced cleanroom environments with state-of-the-art building services to support KLA’s research and manufacturing operations.

 

Throughout the project, the team maintained the highest standards of safety, quality and cleanliness while working closely with KLA’s facilities team to support a seamless transition from the existing facility.

 

Following handover in April 2025, CMB completed a further expansion in August 2025, delivering a new laboratory environment and ISO 6 cleanrooms. Phase Two works included extensions to the process gas and vacuum systems, incorporating more than 16km of process gas pipework.

 

The completed facility reflects the scale and ambition of KLA’s investment in South Wales and demonstrates CMB’s capability to deliver highly technical environments to exacting standards in partnership with its clients.

 

Over the course of the 3.5 years of construction across the multiple phrases of the job, CMB carried out a wide range of Mechanical, Electrical and Fit-Out services. Just some of these included:

 

Mechanical Services:

 

  • Chilled Water Systems

  • Process Cooling Systems

  • Waste Water Treatment

  • LTHW Water Systems

  • Air Handling Units (AHU’s)

  • Pressure Cascade Set-Up

  • General Extract & Supply Ventilation

  • Process Extract

  • Process Vacuum

  • UPW Systems

  • Industrial Water System

  • Wet Deck Installation

  • Fan Filter Units

  • VRF Systems / Air Conditioning

  • Server Room Cooling

  • Gas Suppression

  • Sprinklers / Hydrant Mains

  • Smoke Control Systems

  • Domestic Water Services

  • Above-Ground Drainage

  • Sanitaryware & Public Health Services

  • Rainwater Harvesting System

  • Compressed Air Systems

  • Specialist Process Gases Systems / Gas Cabinets

  • Bulk Gas Distribution

  • Gas Detection Systems  

  • Building Management System (BMS)

  • Commissioning & Validation

 

Electrical Services:

 

  • LV Power Distribution

  • HV Infrastructure

  • UPS Systems

  • Small Power

  • Internal & External Lighting

  • Emergency Lighting

  • Lightning Protection

  • Earthing & Bonding

  • Fire Alarm Systems

  • Security Systems (CCTV, Access Control, Intruder Alarm)

  • Data & Structured Cabling

  • AV Systems

  • Renewable Energy Systems (PV, Battery Storage, EV Charging)

 

Fit-Out Construction:

 

  • ISO 5,6 & 8 Classification Cleanroom Environments

  • Cleanroom Partitions

  • Cleanroom Ceilings

  • Raised Access Flooring

  • Service Pillars & Overhead Service Carriers

  • Overhead Cranes

  • Raised Access Tables

  • Dry Lining Package inc. Ceilings  

  • Decoration

  • Carpentry

  • IPS Systems

  • Secondary Steel Work

  • Flooring

  • Gas Bunker / Wet Plantroom Primary Steel Work

  • Roofing

  • Fire Stopping

  • Facades – Cladding

  • Industrial Doors

  • RC Concrete Frame (incl. Blast Calculations)

  • Floor Slabs

Project Information

Location: Newport

​

Services: Principal Contractor

​

Client: KLA UK

​

Value: £80 Million

​​

Duration: 3.5 Years