HEADINGTON HILL CAMPUS,
OXFORD BROOKES UNI

Oxford Brooke’s University’s Headington Hill Campus is now handed over to a satisfied client, marking yet another successful completion for CMB Engineering. Our team started works on site in December 2023, having secured the £14 Million Mechanical & Electrical contract for the project earlier that year.
Headington Hill Campus is the latest addition to the Oxford Brookes University campus collection and will house the Faculty of Technology, Design & Environment. The 2-bulding development, which sits within a Grade II Listed estate, now houses a new teaching block, faculty offices and an engineering building – all designed to transform STEM and creative activities within the university. A large aspect of the new facility will be centred around the university’s interest in Formula 1 technologies and research.
The teaching block spans across 3 floors and includes an immersion lab, robotics lab, 3D printing equipment, Virtual Reality, Mixed Reality and Augmented Reality technologies, and a dedicated computer suite. A key component to the building is the Virtual Reality Cave, enabling students from a range of courses to create virtual buildings and towns, use interactive CAD design and disassemble a Formula 1 car to test changes to its design.
Meanwhile, the workshop will be the home to specialist engineering equipment with state-of-the-art labs and teaching spaces. These include high voltage testing areas, advanced scanning technologies and an automotive lab with a range of Formula 1 racing cars to be researched on.
With CMB having provided the M&E services throughout the scope of this project, we were often met with some logistical difficulties and hurdles to overcome, but our team managed each of this with success. The M&E services we carried out for the project included:
Electrical:
-
Main LV power and mains distribution
-
Standby Generator
-
Lighting installation
-
Site wide Dali Lighting Control System
-
Intelligent Emergency Exit Signage
-
External lighting installation
-
Small power installation
-
Fire detection and alarm system
-
Structured cabling installation
-
Disabled refuge and toilet alarm systems
-
Access controls and door entry systems
-
CCTV System
-
Lightning protection installation
-
Electrical vehicle charger installation
-
Photovoltaic Systems
Mechanical:
-
Drainage and sanitaryware installation
-
Domestic cold-water services installation
-
Domestic hot water services installation, served by local heat interface units
-
CAT 5 water system installation
-
LTHW heating systems, including roof mounted air source heat pumps
-
General ventilation systems served by roof mounted air handling units
-
Kitchen extract system
-
DX air conditioning systems
-
Sprinkler system including dry risers (teaching block)
-
Misting system (PBW)
-
Specialist process gas systems
-
Specialist local extract ventilation systems
-
Smoke ventilation systems (NHHB)
Project Information
Location: Oxford
Services: Mechanical & Electrical
Client: Oxford Brookes University
Value: £14 Million
Duration: 12 Months